Dark timber home with a steep metal roof, covered porch, bluestone walk and autumn trees on a wooded lot.

Neversink Crossing O&W Rail Trail: Mountaindale to Ferndale

If you've parked at Mountain Dale Depot or at the Hurleyville end of the O&W, you've walked out, turned around and walked back, because the trail used to stop. Now that the Neversink Crossing has opened, it doesn't stop. So where should you start?

Sullivan County, the Town of Fallsburg and the Sullivan O&W Rail Trail Alliance opened the bridge on Thursday, September 17, 2026. It joins the South Fallsburg and Woodridge sections of the trail and finishes improvements that connect more than 13 miles of railbed from Mountaindale to Ferndale. Helen Budrock, who chairs the Alliance, told Radio Catskill that the bridge is "our version of the Walkway Over The Hudson," and that a continuous 13-mile section means people can now make "a day-long excursion out of it."

The comparison works, with one catch. The Walkway has parking and elevators at each end. The Neversink Crossing sits in the most remote stretch of this trail. You reach it on foot, and on one side there's a hill you have to climb around. That puts the hamlet Main Streets at the ends of the route in charge of where a walk starts and finishes.

The bridge has two ways in, and neither is a parking lot

The county's opening notice is direct about access. You can reach the bridge from the trailhead at 269 River Road in Woodridge, or by hiking about two miles in from the South Fallsburg trailhead at 29 Skunk Hollow Road. Clarion Acres Road offers no public access to the river or the bridge.

The bridge itself rewards the walk. It's a prefabricated steel span, 12 feet wide and 180 feet long, set on the original stone abutments the railroad built in the late 1800s. A 50-foot boardwalk over the floodplain extends the western approach. It cost $3.4 million: $1.3 million in federal grants, $1.2 million in state grants, a $400,000 private contribution and $500,000 in county matching funds, with the Town of Fallsburg contributing in-kind services.

It took years to get here. In February, the Sullivan County Democrat reported that federal environmental permitting alone took almost five years, and that costs rose enough during the pandemic to force changes to the project's scope. Budrock said she had worked on it as a volunteer "for well over 20 years." County officials at the time hoped to finish by August. The September opening came a few weeks later.

What each piece of the route is like underfoot

The connected route is made of segments that were built at different times and still feel different. Here's how the Alliance and the county describe them, from east to west:

Segment Published length Surface Access points named
Mountain Dale 2.6 miles Unpaved, cinder Mountain Dale Depot, 11 Railroad Avenue; 20 Greenfield Road, Woodridge
Woodridge 1.7 miles Listed as unpaved; also described as multi-surface 269 River Road; 1 Roosevelt Avenue
Bridge to Fallsburgh Tunnel portal About 1 mile Improved railbed Reached on foot only
Dogpatch Tunnel Bypass About 1.1 miles Unpaved, hilly, moderately steep Dogpatch Park, near Old Country Road and Dogpatch Road off Lake Street
Hurleyville section 6.4 miles 3.5 paved, 2.9 unpaved 16 Mongaup Road and 214 Main Street, Hurleyville; 144 Pleasant Valley Road and 20 Water Street, South Fallsburg

Two things in the table matter for planning. Mountain Dale Depot has parking and public restrooms, which few spots on this route offer. And the Hurleyville section is the only one with long paved stretches, which helps with strollers and road bikes. Its overview gives 6.4 miles and its technical listing gives 6.5, so take the mileage as approximate. Within that section, a 1.9-mile gravel stretch links east to South Fallsburg.

The Alliance hasn't published an exact parking address for the Ferndale end, so the clearest places to start are the Depot in Mountaindale and Main Street in Hurleyville.

The hill in the middle

West of the bridge, the improved railbed runs about a mile to the southern portal of the Fallsburgh Tunnel. The tunnel is closed because of dangerous conditions inside, but you can walk up to the entrance and look in. According to the Alliance, the tunnel is 1,123 feet long and passage is prohibited because its steel support plates have partly collapsed.

Instead of going through, the route climbs over Tunnel Hill on the Dogpatch Tunnel Bypass. That's roughly a mile of unpaved, moderately steep ground, and it's the main break in an otherwise flat railbed. The bypass comes out at the Town of Fallsburg's Dogpatch Park, which has parking, a dog park, a soccer field, a playground and a picnic area.

So the route has a shape. The two ends are gentle. The middle has a river crossing, a sealed tunnel mouth and a climb. A family can start at Dogpatch Park, walk over the hill to the tunnel portal, keep going to the bridge, then head back. That gives you the history in the smallest number of miles. For anyone walking or riding the full length, the climb lands near the middle of the day, so plan your water and your turnaround point with that in mind.

A few Alliance rules matter on any section. The trail is open in daylight only. Pets must be leashed. Motorized vehicles, hunting, alcohol and racing are prohibited. Pedestrians and people with disabilities have the right of way. Helmets are recommended. The posted rules don't say whether pedal-assist e-bikes count as motorized, so check with the Alliance before you bring one. With October sunsets coming earlier every week, the daylight-only rule will decide how far you can get.

Main Street at both ends

At the ribbon-cutting, Sullivan County historian John Conway led a walking tour about how the O&W created and shaped the rail towns along its route. Seventy years after the last train, those towns are the trail's best amenities again, because they're where you can park, eat and rest.

Hurleyville has the most trail-side options. As of an October 8, 2026 update, Morgan Outdoors at 234 Main Street was open Monday, Thursday, Friday and Saturday from 10 a.m. to 6 p.m. and Sunday from 10 a.m. to 3 p.m., and closed on Monday, October 12. At the same address, Forage & Gather Market & Cafe serves coffee, pastries, sandwiches and ice cream. Its website still shows summer hours of 8:30 a.m. to 4:30 p.m. with the kitchen closing at 3 p.m., so confirm before you go this fall.

Taverna, at 218 Main Street, opened quietly in late autumn 2025 in the space the Pickled Owl had run for nine years before closing in early 2025. In April 2026, the Hurleyville Sentinel listed its hours as Monday through Thursday 5 to 9 p.m., Friday and Saturday 5 to 10 p.m., and Sunday 1 to 8 p.m. The owner also planned an outdoor hut beside the building, along the rail trail, to sell refreshments to hikers. Those hours are from spring, and the hut hasn't been confirmed, so check ahead. Casa Mia at 205 Main Street hosted a dinner from its restaurant menu in July. La Salumina at 210 Main Street says on its own site that its retail shop has closed, with wholesale and online gift boxes continuing and a new storefront planned for spring or summer 2027.

Hurleyville also has two cultural stops close to the trail. The Sullivan County Museum at 265 Main Street is open Tuesday through Saturday, 10 a.m. to 4:30 p.m. The Hurleyville Performing Arts Centre at 219 Main Street is hosting the Catskill International Film Festival October 9 through 11, which means this weekend.

Mountaindale anchors the east end. A June 2026 Sullivan Catskills guide featured Julia's Market at 64 Main Street, a Latin market with prepared food, hot food and tacos. Basbousa at 81 Main Street is a participating restaurant in NAMI Sullivan's dining-card program for all of 2026, as the River Reporter noted. With the Depot's parking and restrooms a short walk away, Mountaindale is the more practical starting point for walking west toward the bridge. The 269 River Road trailhead in Woodridge is the shortest way onto the span.

The Alliance's business directory lists more trail-side shops in each hamlet and asks visitors to contact businesses directly for hours.

Late October on the trail

The Alliance lists its 5th Annual HO&WL Haunted Trail Walk for October 23, with location and time still marked "more details to come." It will be the first edition since the trail became continuous, so check the event page as the date gets closer.

One note if you use the Alliance's own pages to plan. Its South Fallsburg page still calls the Neversink bridge a future project. The county's September 17 announcement and the River Reporter's coverage confirm the bridge is open, and the access rules above come from the county notice.

I grew up in Sullivan County, and I'd be glad to swap trailhead notes. Tell me which end of the O&W you're starting from, and I'll share where I'd park, eat and turn around. Jocelyn Justiniano is happy to help, so let's connect.

Work With Jocelyn

Discover everything Upstate New York has to offer with Jocelyn Justiniano. Backed by local knowledge, genuine care, and personalized guidance, she'll help you find the perfect place to call home.

Follow Me on Instagram